Using Resource scheduling with rancher 1.2

Hello,

We would like to utilize the resource scheduling, How can we use it? Basically we would like to tag the catalogue resources with CPU/MEM utilization.

Thanks.

Hi @akashkaveti,

When you upgrade/create a service you can edit the reserved MEM and mCPU(thousandths of a CPU) in the “Security/Host” tab.

If you want to set CPU/MEM reservation for catalog templates, you could go through and upgrade the services with the settings after you deploy it. If you ever upgrade the template, though, I’m pretty sure you would loose any changes you made to the services.